Terms for scheduling deliveries
- Construction logistics
- Coordinating how materials, shared equipment and work areas are used on a construction site, from arrival through unloading.
- Delivery notification
- Advance notice of an incoming delivery, including what it contains, where it goes and when it is expected. Where site approval is required, the notice starts as a booking request.
- Delivery slot
- The agreed window for handling a delivery. Allow time for unloading when setting the slot.
- Crane booking
- Time reserved on a particular crane for unloading, installation or another lift.
- Unloading zone
- The designated location where a vehicle unloads. On some sites it is called an unloading area or delivery bay.
- Unloading equipment
- Equipment needed to unload the delivery, such as a crane or forklift.
- Daily schedule
- The day’s view of confirmed deliveries, resource bookings and periods when access or equipment is unavailable.
- Conflict check
- A check for overlapping bookings or events that require the same area or equipment.
How they fit together
A subcontractor submits a delivery request for formwork. The site team checks the proposed slot, unload area and crane booking. Once confirmed, the slot gives everyone a common reference in the daily schedule.
How to schedule a crane shared by several trades
Request a personal demo
See how RERA works