Site logistics plan: access, cranes and deliveries

A practical guide to a site logistics plan, covering site access, cranes, unloading zones and delivery time slots.

What is construction logistics?

A site logistics plan sets out the site's physical arrangements. Construction logistics covers everything that brings materials, equipment and people to the right place on a site at the right time, and takes them away again: supply, waste removal, movement around the site and the coordination of everyone involved.

What does site set-up include?

Site set-up defines which facilities and equipment are used on site and where they are located. For logistics, these matter most:

  • Access roads, gates and waiting areas
  • Cranes, hoists and other lifting equipment with their reach
  • Unloading zones and storage areas
  • Routes on site and closed-off areas
  • Walkways for people, kept apart from delivery traffic (health and safety)
  • Waste collection points

Requirements for site logistics plans and construction logistics plans, including who prepares them and who provides and pays for site facilities, depend on the contract and applicable local rules.

Five steps to a logistics plan

Planning early means less improvising once construction is under way.

  1. Record areas and access: what is really available in each construction phase?
  2. Define resources: which cranes and unloading zones are shared?
  3. Agree rules: notice period, length of delivery time slots, closure periods.
  4. Organise requests: one request process for all contractors instead of phone calls and lists.
  5. Keep it up to date: areas and cranes change with every construction phase.

Typical mistakes

  • The site layout plan shows the start, not the later construction phases.
  • Deliveries are ordered without a delivery request being submitted to the site.
  • Crane time is allocated verbally and nobody sees the overall picture.

How software helps

Construction logistics software such as RERA reflects the cranes and unloading zones of the site, takes the requests from contractors and shows site management any overlaps in the calendar. The logistics plan itself remains the task of site management.

Request a personal demo   Open the sample project

Frequently asked questions

What is the difference between site set-up and construction logistics?

Site set-up covers the facilities and equipment on site and how they are arranged. Construction logistics is the operation: who uses that equipment, and when.

How large does a site need to be for delivery coordination to be worthwhile?

As soon as several contractors use the same site entrance, crane or unloading area and waiting times occur.