Site logistics plan: access, cranes and deliveries
A practical guide to a site logistics plan, covering site access, cranes, unloading zones and delivery time slots.
A practical guide to a site logistics plan, covering site access, cranes, unloading zones and delivery time slots.
A site logistics plan sets out the site's physical arrangements. Construction logistics covers everything that brings materials, equipment and people to the right place on a site at the right time, and takes them away again: supply, waste removal, movement around the site and the coordination of everyone involved.
Site set-up defines which facilities and equipment are used on site and where they are located. For logistics, these matter most:
Requirements for site logistics plans and construction logistics plans, including who prepares them and who provides and pays for site facilities, depend on the contract and applicable local rules.
Planning early means less improvising once construction is under way.
Construction logistics software such as RERA reflects the cranes and unloading zones of the site, takes the requests from contractors and shows site management any overlaps in the calendar. The logistics plan itself remains the task of site management.
Request a personal demo Open the sample project
Site set-up covers the facilities and equipment on site and how they are arranged. Construction logistics is the operation: who uses that equipment, and when.
As soon as several contractors use the same site entrance, crane or unloading area and waiting times occur.